1. Public money was not part of the original presentation

  • When City Council approved the development in July 2023, residents were presented with a privately proposed residential project.
  • The developer did not tell the neighborhood that millions of dollars in city and county assistance would later be requested.
  • Residents therefore evaluated, and City Council approved, the project without knowing its eventual dependence on public financing.
  • The financing request came later: $6 million from the City of St. Petersburg and $5.25 million from Pinellas County for Phase 1.
  • Construction did not meaningfully move forward until the public assistance was approved.
  • This raises the question of whether the project approved in 2023 was ever financially viable as presented.
  • If public assistance was necessary from the beginning, residents and council members should have been told that during the original approval process.

2. $11.25 million in public assistance benefits relatively few income-restricted households

  • Phase 1 contains approximately 340 apartments.
  • Only 51 apartments are reserved for households earning no more than 80% of Area Median Income, the portion most reasonably described as lower-income housing.
  • Another 51 apartments are reserved for households earning up to 120% of Area Median Income, described as workforce housing.
  • The remaining approximately 238 units will be offered at market rates.
  • The city and county are therefore contributing $11.25 million toward a predominantly market-rate development.
  • Dividing $11.25 million by the 51 lower-income units produces an amount of approximately $220,588 per lower-income apartment. This is not a formal accounting allocation, but it illustrates the scale of the public contribution compared with the number of lower-income households served.
  • Households earning as much as 120% of Area Median Income may face housing pressures, but many residents question whether taxpayers should subsidize apartments for households at that income level, particularly during a period when existing residents are also struggling with property taxes, insurance, food and utility costs.
  • Public officials should explain why this particular development and developer received assistance instead of using the same money for housing serving people with greater needs.
  • Article: The Hard Math Behind the Housing Subsidy

3. Public funding support already extends beyond the $11.25 million subsidy

  • The City has already committed public funds to construct and maintain additional parking spaces along 72nd Street North.
  • After completion, portions of Azalea Cay qualify for substantial property-tax exemptions. The amount will depend on future law, annual applications and decisions by the city, county and other taxing authorities.
  • A full accounting should include direct subsidies, property-tax exemptions, public infrastructure expenditures, fee reductions, environmental oversight, inspections and the continuing cost of city services required by a development of this size.

4. The developer used the prospect of far greater density as leverage

  • During the 2023 hearing, the development team emphasized that the Live Local Act could allow the developer to bypass the proposed site plan and construct as many as 2,387 apartments in buildings reaching 72 feet. That possibility was presented as a reason to accept the smaller, but still enormous, 1,058-unit proposal. Yet, the developer subsequently sought public assistance to finance the first 341 units.
  • Residents are entitled to ask how a developer capable of invoking a much larger project as leverage could then claim to need taxpayer support for the smaller project it proposed.

5. The neighborhood opposed the project

  • At the July 20, 2023 City Council hearing, more than 60 residents spoke against Porter’s proposed 1,058-unit apartment complex. The public testimony was overwhelmingly opposed. In addition, nearly 1,500 people had signed a petition against the development before the hearing. “Azalea Against Apartments” yard signs appeared throughout Azalea and surrounding neighborhoods, demonstrating widespread, highly visible opposition. There was no comparable public campaign in support of the development and not a single “For Apartments” yard sign was seen. Despite that opposition, the City Council approved the project unanimously, 8–0.
  • Nearby residents raised concerns about density, traffic, environmental conditions, construction impacts and the loss of land once associated with substantial local employment.
  • Approval moved forward despite that opposition.
  • Subsequent public financing deepened the resentment because residents are now helping fund a project they did not want.
  • Public agencies appear to measure success through units produced and money invested, while giving less weight to the people who must live beside the project.

6. The project’s true scale is difficult to see in promotional illustrations

  • Developer renderings tend to emphasize attractive buildings, landscaping and open sky.
  • They do not provide a clear, comprehensive view of all three phases and the cumulative mass of approximately 1,058 apartments.
  • Illustrations viewed at street level can make separate buildings appear smaller and less imposing than the complete development will be.
  • Residents should be shown an honest full-site rendering that includes:
    • All three phases
    • The total number and height of buildings
    • Parking areas and garages
    • Internal roads
    • Retention and drainage facilities
    • The relationship to Azalea Park, nearby homes, schools and the recreation center
    • The likely number of vehicles and residents
  • Aerial comparisons and accurate scale models would communicate the project’s size more honestly than isolated architectural renderings.
  • Article: Putting 1,058 Apartments into Perspective

7. More than 1,000 apartments represent a fundamental change in neighborhood density and identity

  • The full project could introduce roughly 2,000 or more residents to a single former employment site.
  • That is comparable to adding a small town within or an established neighborhood. It more than doubles the neighborhood population.
  • Consequences include:
    • More traffic on 22nd Avenue North, 72nd Street and nearby residential streets
    • Increased demand on intersections and turn lanes
    • More vehicles entering and leaving near Azalea Park
    • Greater pressure on police, fire, recreation, utilities and other public services
    • Increased noise and nighttime activity
    • Additional demand on nearby schools and childcare facilities
    • Greater competition for access to roads, parks and neighborhood amenities
  • The analysis should compare the projected population of Azalea Cay with the current population of the Azalea neighborhood or with recognizable nearby communities.

8. The property once supported jobs; the new plan does not

  • The former industrial property once supported over 1,500 skilled and relatively well-paying jobs.
  • The approved development replaces employment land with more than 1,000 residences and 2,000 people.
  • West St. Petersburg does not have a comparable concentration of new employment opportunities planned for the people who will live there.
  • Residents may have to commute elsewhere for work, adding traffic rather than creating a walkable employment center.
  • City planning appears focused on adding housing units without a corresponding plan for where residents will work.
  • A complete growth strategy should consider housing, employment, transportation and public services together.

9. The site has a serious contamination history

  • Soil and groundwater contamination was discovered decades ago when the property was used for defense-electronics research and manufacturing.
  • Contaminated groundwater migrated beyond the property into nearby residential areas.
  • Chemicals identified in the broader investigation have included 1,4-dioxane, trichloroethene and cis-1,2-dichloroethene.
  • Treatment and monitoring have continued for decades.
  • This history does not prove that present-day airborne dust is contaminated, but it makes residents’ questions reasonable and necessary.
  • Excavating a former industrial property requires a higher level of transparency than ordinary construction on previously undeveloped land.
  • Sources considered reliable indicate that construction-related excavation or dewatering could alter groundwater conditions and cause the underground contamination plume, gradually reduced through years of remediation, to expand again.

10. Residents still do not know what is in the dust

  • Visible dust has been photographed leaving the site and reaching Azalea Park.
  • Nearby locations include:
    • Azalea Elementary School
    • Gingerbread School
    • Azalea Recreation Center
    • Azalea Park
    • Neighborhood homes
  • Residents have been told that monitoring equipment may be operating on the property, but essential information remains unavailable:
    • What equipment is being used?
    • Where is it located?
    • Who operates it?
    • What pollutants or contaminants does it detect?
    • Does it measure only ordinary particulate matter?
    • What action levels trigger work stoppages or additional controls?
    • Are readings continuous or occasional?
    • Will the results be made public?
  • A general county air monitor located approximately two blocks away cannot necessarily determine what is in dust originating from this particular site.
  • Residents can see the dust but cannot determine whether it is simply a nuisance or a potential health concern.
  • Images: Fugitive Dust from the Construction Site

11. Construction workers may face the greatest immediate exposure

  • Workers performing excavation and soil movement spend their workdays closest to disturbed soil.
  • If contaminants are present in airborne dust, workers could receive more direct and prolonged exposure than surrounding residents.
  • Public discussion has concentrated on the neighborhood, but worker protection should also be examined.
  • Residents should know what occupational monitoring, protective equipment and safety procedures are required.

12. Future Phase 1 residents will live next to Phase 2 construction

  • Phase 1 tenants are expected to move into the development while Phase 2 construction is occurring immediately next to them.
  • Those residents will experience:
    • Construction dust
    • Excavation noise
    • Truck traffic
    • Ground vibration
    • Temporary road and access changes
    • Years of living beside an active construction site
  • The environmental concerns affecting today’s neighbors could eventually affect the development’s own tenants.
  • Prospective tenants should receive clear disclosure about the schedule and proximity of future construction.

13. Dust control appears reactive rather than transparent and preventive

  • Water trucks have been observed, but residents have not received a clear public explanation of when watering is required or how compliance is documented.
  • The Soil Management Plan discusses visual dust evaluation, restrictions on soil movement during high winds, covering stockpiles and using water to control dust.
  • Perimeter monitoring may be required when dust cannot be adequately controlled with water.
  • Residents should not have to photograph a dust event before officials or contractors respond.
  • There should be a publicly understandable dust-control protocol and an accessible method for reporting violations.

14. Environmental information is scattered and difficult to obtain

  • Relevant information is divided among city permits, FDEP records, county air-quality records, site-management plans and developer-controlled monitoring.
  • Ordinary residents cannot easily determine which agency is responsible for a particular issue.
  • Each agency can refer residents to another agency without anyone providing a complete answer.
  • Publicly financed development should include a central webpage containing:
    • Current permits
    • Inspection reports
    • Environmental monitoring results
    • Dust complaints and responses
    • Work schedules
    • Corrective actions
    • Contact information
    • Notices of unusual conditions or exceedances

15. Public financing should require environmental disclosure

  • Taxpayers are contributing $11.25 million to Phase 1.
  • That contribution should give the city and county leverage to require stronger protections and greater transparency.
  • Environmental monitoring should not be treated as proprietary information when public health and public money are involved.
  • Any future financial assistance for Phases 2 or 3 should require:
    • Contaminant-specific air monitoring
    • Public access to monitoring results
    • Prompt notification of exceedances
    • Independent review
    • Enforceable dust-control requirements
    • Clear penalties for noncompliance

16. Government review focused on making the project work, not on whether it benefits the neighborhood

  • Financial underwriting appears to have examined whether the project was viable and whether assistance was needed.
  • That is different from determining whether the project creates a net public benefit.
  • Residents have not seen a complete accounting comparing:
    • New property-tax revenue
    • The cost of public subsidies
    • Potential property-tax reductions or exemptions
    • Infrastructure costs
    • Police and fire-service demands
    • Traffic improvements
    • Environmental oversight
    • Park and recreation impacts
    • Long-term maintenance and public-service costs
  • “Financially viable for the developer” is not the same as “financially beneficial to taxpayers.”

17. The development is already affecting quality of life

  • The effects will not begin when tenants move in; they began when uncertainty, excavation and controversy reached the neighborhood.
  • Residents are worried about dust, traffic, contamination, public spending and future construction.
  • Neighbors have spent significant time attending meetings, taking photographs, reviewing technical documents, contacting agencies and trying to obtain answers.
  • The project has generated anger, anxiety and distrust.
  • These impacts are difficult to place in a financial spreadsheet, but they are real quality-of-life costs.
  • Residents should not be dismissed merely because those effects cannot be expressed as a permit condition or dollar amount.

18. The approval process damaged public trust

  • Residents were initially asked to accept the project partly because the alternative might be larger.
  • Public subsidies were not part of the original neighborhood discussion.
  • Environmental monitoring remains difficult to understand.
  • Monitoring controlled by the developer has not been made publicly accessible.
  • Agencies have provided fragmented answers rather than one clear account of the project’s safeguards.
  • Each of these issues reinforces the perception that decisions were structured to move the development forward while residents were expected to adapt afterward.

19. Public financing for later phases should not be approved

  • Approval of the overall plan does not mean taxpayers must subsidize every phase.
  • Future funding requests should receive a fresh public review.
  • Council members who were not present for the original 2023 approval should independently examine the project rather than treating earlier decisions as settled policy.
  • Before additional assistance is considered, the city and county should evaluate:
    • Phase 1 occupancy
    • Actual traffic effects
    • Environmental compliance
    • Dust-monitoring results
    • Tenant complaints
    • Construction delays and cost increases
    • The developer’s ability to finance later phases privately
  • Residents can reasonably oppose additional subsidies even if they cannot reverse the original development approval.

20. Economic Risks and Future Subsidies

Economic conditions have changed considerably since the project was approved in 2023, and conditions could change again before Phase 2 financing is arranged around 2029.

  • Phase 1 could experience construction delays, cost overruns, higher financing expenses or slower-than-expected apartment leasing.
  • These are normal development risks that should be borne by the developer, investors and lenders, not transferred to taxpayers.
  • The city and county have already committed $11.25 million toward Phase 1. No additional public money should be provided to cover financing gaps or cost overruns.
  • Any future funding request should be evaluated independently and only after Phase 1’s actual costs, occupancy, rents, environmental record and neighborhood effects are known.
  • Updated housing data weaken the case for additional workforce-housing subsidies. Recent Shimberg Center reports show a regional surplus of affordable and available rentals when households earning up to 120% of AMI are included, while a serious shortage remains for households below 80% AMI. Pinellas County has relied on these findings to opt out of the property-tax exemption for the 80%–120% category. This does not change Azalea Cay’s existing commitments, but it raises serious questions about providing additional public assistance for future workforce units rather than directing limited funds toward lower-income households.

21. New tax revenue does not necessarily mean a profit for the city

Azalea Cay Phase 1 will expand St. Petersburg’s property-tax base by replacing a largely vacant industrial property with approximately 340 taxable apartments. Pinellas County’s project analysis estimated an annual property-tax bill of about $845,000 after affordable-housing exemptions. Because the total is divided among the city, county, school district and other taxing authorities, St. Petersburg’s estimated share is only about $250,000 to $275,000 annually. Although that revenue recurs each year, it is modest in relation to the project’s size and the city’s $6 million subsidy. The yearly amount is roughly half the market value of a single home in Azalea.

The city has already committed $6 million in public funding toward Phase 1. At $250,000 annually, it would take approximately 24 years for the city’s share of the property taxes to equal its original subsidy. This is only a simple gross comparison: property taxes are not specifically set aside to repay the subsidy, future assessments and tax rates may change, and the calculation does not account for the cost of providing city services.

The development will add hundreds of households that require police and fire protection, road and traffic management, stormwater and infrastructure maintenance, parks and recreation, code enforcement and other municipal services. Consequently, the full property-tax contribution cannot reasonably be treated as profit or repayment of the subsidy.

Azalea Cay will produce new tax revenue, particularly because most Phase 1 apartments will be market-rate, non-homesteaded rental units. However, the relevant question is not simply whether the project expands the tax base. It is whether the additional revenue, considered over time, will outweigh the initial subsidy and the continuing public cost of serving a large residential complex.

Additional residents may also generate sales-tax revenue through purchases at local stores, restaurants and other businesses. St. Petersburg receives portions of sales-tax revenue through state and local distribution programs, but it does not retain all the sales tax paid by city residents. The benefit cannot be calculated simply by multiplying the number of residents by their spending. Groceries and many services are exempt, some purchases will occur outside the city, and locally shared sales taxes are distributed according to government formulas and may be restricted to particular purposes.

If the developer completes Phases 2 and 3, those apartments would add substantially more taxable property and could generate additional consumer spending. They would also bring hundreds more households requiring public safety, transportation, infrastructure, recreation, code enforcement and other services. Without a comprehensive fiscal-impact analysis, there is no basis for assuming that the additional property and sales-tax revenue would exceed the city’s added expenses, particularly if the developer seeks further public subsidies for the later phases.

Conclusion:

  • The objections concern the combination of extraordinary density, a contaminated former industrial site, weak environmental transparency, substantial taxpayer support, limited lower-income benefit, inadequate attention to employment and transportation, and a process that repeatedly placed the developer’s interests ahead of neighborhood concerns.
  • As the project proceeds, public officials have a responsibility to protect workers, residents and future tenants.
  • No additional public money should be provided to cover financing gaps or cost overruns. The developer is expected to finance his own project.