AHSPR 23-02 — 23 Special Conditions of Approval
Former Raytheon Property, 1501 72nd Street N
About these conditions: The text is taken from the City of St. Petersburg's approval of AHSPR 23-02. Short descriptive headings have been added to make the list easier to navigate; the wording of the conditions themselves has not been substantively changed.
Conditions 19–23 together are particularly relevant to the questions residents have about construction at the former Raytheon site because they specifically address DEP clearances, soil management, construction monitoring, contaminated soil, groundwater and environmental non-compliance.
On July 20, 2023, the St. Petersburg City Council voted 8–0 to approve the development request for the former Raytheon property. The approval included the following 23 Special Conditions of Approval:
1. Affordable and Workforce Housing Restrictions
Prior to the issuance of a building permit, the applicant or property owner shall record a Declaration of Restrictions on the property, which must be approved as to content and form by the City Attorney’s Office prior to recordation. The Declaration of Restrictions will require the dwelling units to be income and rent restricted in accordance with this report for a minimum period of 30 years from the date of the Certificate of Occupancy. The unit mix will include 159 units at 80% AMI and below, and 159 units at 120% AMI and below.
2. Annual Income Verification Report
The applicant or property owner shall provide an annual report to the City of St. Petersburg providing evidence of income verification for affordable and workforce units. At the request of the City, the property owner shall provide documentation of a tenant’s income and shall permit the City to inspect a vacant dwelling unit or an occupied unit with the permission of the tenant.
3. Tenant Income and Rent Compliance
The applicant or property owner shall income verify all affordable/workforce tenants and failure to rent the units to income qualified tenants at rents at or below those approved by and promulgated by the State of Florida for Multi-Family Rental Programs in accordance with the income levels established by Special Condition Number One in this report shall be a violation of this special condition of approval and, as such, a violation of the City Code enforceable by the City of St. Petersburg Codes Compliance Assistance Department. Rents found to be charged in excess of the income and rent categories referenced in the Declaration of Restrictions shall be required to be reimbursed to the tenants. Income increases for existing tenants shall be regulated by the guidelines published for the Low-Income Housing Tax Credits (LIHTC) program.
4. Affordable Housing Management
The applicant or property owner shall provide evidence of a management company with experience in affordable housing income documentation requirements and a management plan prior to issuance of a Certificate of Occupancy. Any change to the management company or management plan during the required affordability period shall be reported via letter or electronic mail to the City’s Housing & Community Development department.
5. Easements
No structures, including dumpster enclosures and bicycle storage, shall be located in an easement. Any necessary relocation of structures due to easements shall be approved by the Housing & Neighborhood Services Administrator or City Administrator.
6. Internal Sidewalk Network
All buildings on-site shall be connected via a sidewalk network. Please see attached Site Plan marked up by Planning for required connections.
7. Connections to Public Sidewalks
The sidewalks on private property shall connect to the public sidewalks in the abutting rights-of-way.
8. Pedestrian Lighting
Pedestrian scale lighting shall be provided along the internal sidewalk network.
9. Building Design
All buildings on-site shall comply with Section 16.20.030.11 Building Design. The architectural elevations submitted for permitting shall be substantially similar to those attached to this report.
10. Signs
Signs, if proposed on the site, shall comply with all sign regulations of Chapter 16 of the City Code.
11. Dumpsters
The proposed location of on-site dumpsters shall be approved by the City’s Sanitation Department. Dumpsters shall have an enclosure with opaque gates.
12. Mechanical Equipment
Any mechanical equipment abutting rights-of-way shall be screened with architectural features that match the building.
13. Exterior Lighting
Exterior lighting shall comply with Section 16.40.070.
14. Bicycle Parking
Bicycle parking shall comply with Section 16.40.090.4.1.
15. Engineering Department Requirements
Plans shall be revised as necessary to comply with comments provided by the City’s Engineering Department in the attached memorandum dated March 16, 2023.
16. Transportation and Parking Requirements
Applicant must follow all feedback provided in the memo from the Transportation and Parking Management Department dated 3/23/23 and 6/2/23. Includes:
- Coordination with PSTA on future transit stop
- Enhanced pedestrian crosswalks
- Restriping of 22nd Ave N
- Curb ramps rebuilt to be ADA compliant
- Parking cannot be provided near speed humps or pedestrian crosswalks
17. Financial and Affordable Housing Documentation
An updated sources and uses document providing information on reserves for replacement showing the units can be maintained during the affordability period is required to be submitted before commencement of construction. Applicant must submit the Operating Proforma along with the Sources & Uses showing replacement reserves. A phasing plan and other documents related to affordable/workforce housing units noted on page 4 must also be provided prior to issuance of building permits.
18. Approval Expiration
This approval will be valid for 36 months from the date of approval. Substantial construction shall commence prior to this expiration date, unless an extension has been approved by the POD. A request for extension must be filed in writing prior to the expiration date.
19. DEP Clearances Before Permits
Right-of-way (ROW) and building permits, including site and foundation permits, shall only be issued upon applicant’s submittal of proof of all necessary DEP clearances and approvals, which may include, but are not limited to: a soil management plan, any required engineering and institutional controls, and a construction monitoring plan.
20. Compliance With DEP Requirements
All ROW and building permits approved by the City shall include compliance with all DEP requirements as a condition, with penalties for non-compliance to include potential issuance of a stop work order.
21. Transport of Contaminated Soil
If DEP requires transport of contaminated soils from the site at any point during construction of the project, then applicant shall ensure that transport of the material occurs in sealed containers, or best practice approved by DEP.
22. Groundwater Dewatering
Any groundwater dewatering activities that will require containment and disposal shall do so without use of the City’s stormwater system.
23. Reporting Environmental Non-Compliance
Notice of non-compliance with DEP requirements regarding construction monitoring activities shall be promptly reported to the City, which notice shall also include required corrective action(s), if any.
Editor’s Note: These are the 23 Special Conditions of Approval as stated in the City’s July 2023 AHSPR 23-02 approval. Subsequent approvals, permits, agreements or amendments may have modified or supplemented some project requirements.